Skip to main content

The artifacts of this phase

Each phase of the Problem-Driven AI methodology produces specific artifacts. They are not optional. They are the evidence that the work was done rigorously and the decisions that power everything that follows. In Solution Phase, the six artifacts ensure that every solution is generated without judging, decomposed across four dimensions, tested against explicit assumptions, evaluated with traceable criteria, validated with stakeholders, and consolidated into a single document that feeds Phase 3.

ArtifactFormatBuilt by
Ideation BoardCollaborative visual board (Miro, FigJam, post-its)The full team during Divergence
Solution TreesCollaborative visual board or structured documentThe team during Structuring
Assumptions RegisterTable (Google Sheets)The team. Started during Structuring, updated at each step
Decision MatrixTable with 1-5 scores and weights per criterion (Google Sheets)The team during Convergence. Weights set by the Decision Owner
Feedback LogChronological log (Google Docs, spreadsheet)The facilitator during external and internal validation
Solution BriefStructured document in 8 sections (Google Docs)PM / Product Lead with team input

1. Ideation Board

Visual record of all generated solutions, grouped and with notes on why non-selected ones were discarded. It is the memory of explored options — it prevents the team from reinventing what it already discarded with reason.

  • Format: Collaborative visual board (Miro, FigJam, post-its).
  • Built by: The full team during Divergence. Product Lead facilitates the session.
  • When it's created: Step 1 (Divergence). First artifact of the phase.

2. Solution Trees

Decomposition of each candidate solution across the four dimensions: business, model, architecture, and data. They make visible the real complexity of each solution, revealing gaps and dependencies that the abstract idea doesn't show.

  • Format: Collaborative visual board or structured document.
  • Built by: The team during Structuring. Product Lead + Tech Lead per candidate solution.
  • When it's created: Step 2 (Structuring). After divergence narrows to candidate solutions.

3. Assumptions Register

Classified list of all assumptions: verified, low risk, high risk, and unknown. With an action plan for high-risk ones. Assumptions are invisible risk — this register makes them visible and manageable.

  • Format: Table (Google Sheets).
  • Built by: The team. Product Lead initiates the register, the entire team feeds it throughout the process.
  • When it's created: Started in Step 2 (Structuring) and updated continuously throughout the phase.

4. Decision Matrix

Evaluation of candidate solutions against weighted criteria: impact, technical viability, business viability, assumption risk, and adoption friction. It makes explicit the reasons for the choice, preventing the decision from being made by intuition, politics, or authority.

  • Format: Table with 1-5 scores and weights per criterion (Google Sheets).
  • Built by: The team during Convergence. Weights are set by the Decision Owner before scoring begins.
  • When it's created: Step 3 (Convergence). After Solution Trees expose the real complexity.

5. Feedback Log

Cumulative record of all client and stakeholder feedback: who said it, what they said, how it was incorporated, or why it was discarded. It provides total traceability of the alignment process — if someone asks "why was this chosen," the answer is here.

  • Format: Chronological log (Google Docs, spreadsheet).
  • Built by: The facilitator during external and internal validation sessions.
  • When it's created: Started in Step 4 (Client validation) and updated through Step 5 (Internal stakeholder validation).

6. Solution Brief

The most important document of this phase. Contains: the problem it solves, solution description, decisions made and justifications, dimension decomposition, active assumptions, agreed success criteria, constraints, actors, and Translatability Map. It is the entry document to Phase 3 (Context Phase) — everything the AI does afterwards is based on this document.

  • Format: Structured document in 8 sections (Google Docs).
  • Built by: PM / Product Lead drafts the document with team input. The team validates it.
  • When it's created: Written after Step 5 when consensus exists. It consolidates the entire phase into a single document.
The solution as a living document

The Solution Brief is not a static document — it is the starting point for the AI's work. Any ambiguity, contradiction, or omission in this document will propagate to every artifact built in Phase 3. Take the time to make it precise.